Piedmont Lake Shoreline Projects

2016-2017 Goodrich Cottage Area Shoreline

 Contractor: Cross Roads Construction

Final Restoration: Goodings Nursery

Contract Price: $239,343.67

Project Length: 1031 LF

Project Description:

  • P05001 Goodrich: Type C Rock Riprap and Type C Rock Riprap capped with a Soil Encapsulated Lift (SEL) seeded with ODOT lawn seed mix. Project located along the eastern most end of the Goodrich Cottage Area.
  • P06002 Goodrich: Type C Rock Riprap capped with a Soil Encapsulated Lift (SEL) Seeded with ODOT lawn seed mix. Project located in the middle of the Goodrich Cottage Area.
  • P99037 Goodrich: Type C Rock Riprap Toe with Soil Encapsulated Lifts (SELs) vegetated with live stakes and seeded with slope stabilizing custom seed mix. Project located along the western most side of the Goodrich Cottage Area.

Click here for project location: P05001, P06002, P99037

2011-2012 Shoreline

Contractor: Tucson Inc.

Contract Price: $350,272.10

Project Length: 1935 LF

Project Description:

  • P97001: Type C rock riprap project near Lake Ridge Road, parts of which were vegetated with live stakes, that also included a 6 foot wide native Riparian Buffer Seed Mix to better stabilize the ground above the riprap.
  • P99014 Harrison Co Club: This Type C rock riprap project near the end of Harrison Boat Club Road was vegetated with live stakes and included the use of a native slope stabilization seed mix to better stabilize the slopes above the riprap.
  • P99020 TR361: This project located near the end of TR360 was the District’s first use of Soil Encapsulated Lifts for bank stabilization.  The soil lifts were constructed above a base of Type C rock riprap which was vegetated with live stakes. A slope stabilization custom seed mix was used on the lifts and a native riparian buffer custom seed mix was utilized above the soil lift area.
  • P99029 Reynolds Rd:  This Type C rock riprap project, located where TR803 first meets the lake, protects the adjacent road from being damage by shoreline erosion.
  • P99047 Marina: Type D rock riprap project includes the use of a native Slope Stabilization seed mix to better protect the steep slopes above the riprap. 

Click here for project location: P97001, P99014, P99020, P99029, P99047